moooon
Motir
Vibe the project. Bring an idea — Motir's three AI layers plan it, track it, and ship it, end to end. You're looking at Motir, built in Motir.
- Vibe Project
- Open Source
- AI Agent
- AI Loop
- 5
- Anfragen
- 4
- Stimmen
- 404
- geplant
- 4.190
- ausgeliefert
- Planning bug: a copy card scripted a PUBLIC marketing claim about an unshipped capability — no gate checks a customer-facing sentence against the product, because the precondition rule only asks whether the card can be BUILT
- Planning bug: a `coding_agent` card carried a criterion only a BROWSER SESSION can discharge — minting a `CLI_TOKEN_GRANT` token is cookie-session-only by design, and no gate noticed
- Planning bug: MOTIR-4651 asked for a SQL data migration that ALSO deletes object storage through a TypeScript service — two criteria one medium cannot satisfy, and the implementer's only way out was a manual production step no card carries
- Planning bug: a card put a per-phase asymmetry in the SHARED tier — the clause was true on one phase and forbade the other phase's deliverable
- Planning bug: MOTIR-5403 specified adoption for a stored card under a PROPOSED container — a shape the plan append refuses, because a `modify` re-parents only onto an existing work item
- Planning bug: a flaky-test card grouped three tests as "same shape" by reading their STEPS, not by asking which assertion rides the write's response — two of the three were already waiting
- Planning bug: MOTIR-5355 was created at `todo` with a calendar/population entry condition only in prose — readiness sealed it `ready: true` and a run claimed it ~7 weeks before its data can exist
- Planning bug: a split re-sized MOTIR-4592 by SUBTRACTING what left instead of re-listing what stayed — 3 pts / 55 min for ~8 / 110
- Planning bug: MOTIR-5144 carries `executor: human` — an explicit override of `verification`'s agent default — and then writes its recipe as an MCP call no human can make
- Planning bug: two sibling stories built ONE freshness substrate — the shipped module even named the story it superseded, and nothing read it
- Planning bug: MOTIR-4319 asserted `addresses.primary` as the read path for MOTIR_BASE_URL and enumerated 3 of at least 7 origin-naming registrations — both derived from code, neither read
- Planning bug: a region measured by SEARCHING for its boundary — `SHARED PLANNING RULES` occurs inside the framing it was cutting
- Planning bug: MOTIR-3892 "measured" a closed PR from its CARD — #332 never split the constant, changed no test, and turned no guard red
- (motir-core) E2E GitHub MERGE seam — `E2E_TEST_GITHUB_MERGE` intercepts merge, merge-queue rules and enqueue on the shared MockAgent, steered per pull request by a control fileApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) Playwright acceptance E2E + VIDEO — gate appears on green, Approve and merge reaches `approved`, a queued PR waits, one refused names its PR, a bystander sees no verbsApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) Story VITEST gate — the coverage floor over the pull-request arm, the raise → decide → merge seam on real Postgres, the one-control / one-door / totality guards, and the two-green-webhooks raceApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) The To-approve tab's PULL-REQUEST row — the kind's glyph and subject line replace "Not built yet" (en + zh)Approval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) The Development frame GETS ITS VERBS — Approve and merge · Request changes, each pull request's merged / queued / refused outcome in place, and the docs (en + zh)Approval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) APPROVE AND MERGE — one press commits the approval, then merges each pull request, or enqueues it where the repo has a merge queue, via MOTIR-4882's pathApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) RAISE and WITHDRAW the gate — one `awaiting` `pull_request_approval` on the run target when its delivery set turns green, superseded when a member's head moves, and never two at onceApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join