moooon
Motir
Vibe the project. Bring an idea — Motir's three AI layers plan it, track it, and ship it, end to end. You're looking at Motir, built in Motir.
- Vibe Project
- Open Source
- AI Agent
- AI Loop
- 5
- 요청
- 4
- 추천
- 462
- 계획됨
- 4,445
- 출시됨
- Plan substrate (7.21) can't carry leaf sizing — PlanItemProposedFields/UpdateProposalInput + materialize need storyPoints + estimateMinutes (the estimation gate)
- Work-item-link (5.8) chips ONLY the explicit [label](motir:<id>) token — a bare MOTIR-<n> wires the relates_to edge but never renders as a chip; normalize bare keys on write
- 7.28 pre-commit plan validation can't validate a NEWLY-PROPOSED subtree — validateProjectedWorkItem anchors only on a REAL key, so any new epic/story/subtask the plan creates can't be the validation root
- Epic 5: Collaboration & fields
- 5.8.8 Playwright E2E — @-mention a work item → live chip + relates_to → peek/rename/archive/deleteEpic 5: Collaboration & fields
- 5.8.7 Integration vitest — reference-on-write → relates_to seam (real Postgres)Epic 5: Collaboration & fields
- 5.8.5 Editor — unified `@` mention picker (people + work items) in `MarkdownEditor`Epic 5: Collaboration & fields
- 5.8.6 Render — live internal-link chip in `MarkdownView` + title linkify (archived/deleted states)Epic 5: Collaboration & fields
- 5.8.3 Schema + service — parse refs on write → auto-create `relates_to` linkEpic 5: Collaboration & fields
- 5.8.4 Work-item candidate search endpoint for the `@` pickerEpic 5: Collaboration & fields
- 5.8.2 Work-item reference token + parse/resolve helper (`lib/mentions`)Epic 5: Collaboration & fields
- 5.8 Work-item mentions & internal links (cross-references)Epic 5: Collaboration & fields
- 5.8.1 Design — work-item mention picker + internal-link chip (+ title link, archived/deleted states)Epic 5: Collaboration & fields
- motir-core: render the structured per-tier `summary` in the canvas captured-findings (replace the Markdown-derive)
- motir-ai: expose a structured per-tier `summary` on the pre-plan read (GET /v1/preplan)
- Declined plan detail shows the empty no-proposals state instead of the declined outcome
- After the last tier completes, auto-route into the design wizard (don't stop on the hub)
- Active “you are here” step: quick-view needs a Continue, and “open full screen” should resume the in-page gate (not a new tab)
- E2E flake: dashboards.spec.ts:206 (drag/reload persists) returns non-200 in bulk-2 shard
- main red: plan-item-node.test.tsx — PlanItemNode renders raw i18n keys (aiPlanning.*), Vitest fails (MOTIR-847)