- ▸MOTIR-2124.1 Sprint + backlog data modeldone
- ▸MOTIR-2184.2 Backlog UI (groom + rank + assign to sprint)done
- ▸MOTIR-2254.3 Story-point estimationdone
- ▸MOTIR-2334.4 Sprint lifecycle (start / complete)done
- ▸MOTIR-2434.5 Scrum board (sprint-scoped view)done
- ▸MOTIR-2484.6 Velocity + burndown chartsdone
- ▸MOTIR-2564.7 Tests — the cross-cutting Scrum journey at scale (sprint-scoped load · drag · swimlanes · WIP · complete + carry-over)done
- MOTIR-260bug-backlog-zh-sprint-translated-as-chongci Backlog (zh): "Sprint" inconsistently localized to 冲刺 — should stay Latin "Sprint"done
- MOTIR-261bug-issue-list-not-refreshed-after-create Issue list / tree does not update after creating a new work item via the modaldone
- MOTIR-262bug-backlog-selection-bar-move-to-backlog-always-shown Backlog selection bar: "Move to backlog" button is shown even when every selected item is already in the backlog (should hide / disable)done
- MOTIR-75611 Sprint complete: target sprint card / backlog not refreshed when unfinished items movedone
- MOTIR-1328Readiness calc counts ARCHIVED items as open blockers — archived node phantom-gates its dependents out of the ready setdone
- MOTIR-1492Sprint ⋯ actions menu is disabled — enable it + wire Delete (backend DELETE /api/sprints/[id] already exists)done
- MOTIR-1493Add Rename to the sprint ⋯ menu — wire the existing PATCH /api/sprints/[id] name (UI gap)done
- MOTIR-1494Add Edit-dates to the sprint ⋯ menu — wire the existing PATCH /api/sprints/[id] start/end (UI gap)done
- MOTIR-1495Planned-sprint committed-points badge goes stale after moving an item out — useSprintPoints never re-fetchesdone
Showing 16 of 16