moooon
Motir
Vibe the project. Bring an idea — Motir's three AI layers plan it, track it, and ship it, end to end. You're looking at Motir, built in Motir.
- Vibe Project
- Open Source
- AI Agent
- AI Loop
- 6
- requests
- 4
- upvotes
- 548
- planned
- 5,435
- shipped
- (motir-ai) The LESSON axis still spells the phases `skeleton` / `deepen` while the planner runs `lay` / `author` — three vocabularies for two phases in one prompt, the `skeleton` tool name colliding with the `skeleton` lesson value, and no session is ever TOLD which phase it is in or what the two phases are
- (motir-core) The approval frame's PORT MECHANICS and the `X` state — a floor, a ceiling that scrolls itself, Expand to the viewport, and verbs gated on the port having RENDEREDApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) The gate's AUDIT SET is never WRITTEN — all six columns MOTIR-4912 shipped are null in production, and the handler's `routeTo` has no caller at allApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) `render-design-mock.mjs` CRASHES on the second render of a NEW asset — the baseline read treats an uncommitted `.png` as fatal
- 2200.26 (motir-core) A sibling the level's 200-row cap DROPPED comes back as a red "blocked elsewhere" ghost — the off-level test asks "is the blocker among the rows we FETCHED?", never "is it on this LEVEL?"
- Planning bug: a card asked a motir-core reader to report a motir-ai field, and inherited the NAME `indexMode` as if it meant the same fact on both sides of the boundary
- 2200.21 (motir-ai) STOP deciding a snapshot's usability from a constant motir-ai compiled in — offer the pointer with the version it was recorded at, and let the engine that will open it decide
- 2200.28 (motir-core · design) The plan-detail pane after approval draws the establish band over the canvas UNCONDITIONALLY — the design of record has no state for a project whose set is already settled
- 2200.23 (motir-ai) Production migrations run through Neon's POOLER — `prisma.config.ts` re-implements the unpooled resolution without `seedDatabaseUrl`'s derive, and three deploys have died on an advisory-lock timeout
- 2200.17 (motir-core) NOTHING binds a memoized step's ID to its RESULT SHAPE — a shape change that keeps its id replays last week's JSON into this week's reader, and 66 `step.run` sites have no guard
- (motir-core) The approval frame's DECIDED and WITHDRAWN states — `E` still shows the version that was approved and says its files are kept, and `G` says the question was withdrawnApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- Planning bug: MOTIR-4969 attributed `link_pull_request` to THE RUN — it is the dispatched AGENT's call, and the CLI has no v1 door at all
- (motir-core) Document the approval GATE and its DESIGN kind — the docs page, the ADR's own record, and the `CLAUDE.md` pointer an agent meets when it publishes a design resultApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- 2200.19 (motir-ai) The container must REFUSE a restored snapshot its own engine calls stale — the guard, landed before anything starts offering one
- (motir-core) The universal approval FRAME — three bands, a kind-supplied verb set, seven states — and the Design result section BECOMES itApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join
- (motir-core) `link_pull_request` flips a card to `implemented` even when the pull request is a DRAFT — `resyncLinkedPullRequest` hard-codes the lifecycle and the stored row records no draft-ness
- (motir-core) A GitLab DRAFT merge request never reaches `implemented` — the un-draft event is `action: 'update'`, which `HANDLED_MR_ACTIONS` deliberately does not handle
- 2200.15 (motir-core) The SCOPED run never opens its session PR mid-run — `openPrEagerly` is a lane gate `scopeDrain.ts` cannot take, so point 1 of the decided lifecycle is unimplemented for the lane it was decided for
- 2200.13 (motir-core) The organisation surface still promises the RETIRED workspace rung — two strings say a set-less project "can also reach" a repository, and one of them is reassurance on the DISCONNECT dialogue
- (motir-core) RETENTION — an approved version's bytes are PINNED, a superseded subject retires its awaiting gate, and neither races a concurrent publishApproval gates — every decision that holds work up happens IN Motir, behind ONE approve language new kinds join